The following is a list of Permission to Lodge determinations made by NSW Maritime since 12 November 2007.
To find an individual determination, click on the button below or PC users should press the “Control” and “F” keys simultaneously and type any keyword. Mac users should use the “Command” and “F” keys.
For example if you wish to find a Permission to Lodge determination made with respect to NSW Maritime’s land at Mosman, type the word “Mosman”.
To find another determination in Mosman simply press “Find next”.
| No. |
Determined Date |
Date Received |
Status |
Applicant Name |
Site Address |
Development Description |
| 898 |
17-Jun-10 |
29-Dec-09 |
Determined |
Garrick Michael Hawkins |
21 Coolong Road, Vaucluse |
Removal of existing steps and associated piles; construction of new pontoon |
| 935 |
17-Jun-10 |
31-Mar-10 |
Determined |
Simmer on the Bay - Strata Plan 73989 |
Walsh Bay Pier 3, 13 Hickson Road DAWES POINT |
Proposed erection of new awning and signage, renewal of existing consent |
| 936 |
16-Jun-10 |
01-Apr-10 |
Determined |
Robert and Linda Hepworth |
20 Lyndhurst Crescent HUNTERS HILL |
S96 - to modify DA658/07 - Proposed move of cerntreline of the approved concrete landing, ramp,pontoon and 2 fender piles to northeast by 900mm |
| 946 |
17-Jun-10 |
10-May-10 |
Determined |
Manly 16ft Skiff Sailing Club |
Cnr Stuart St & East Esplanade MANLY |
Deletion of condition regarding membership numbers of the club |
| 955 |
17-Jun-10 |
02-Jun-10 |
Determined |
GR8 Pub Holdings Pty Ltd |
22 The Promenade, King Street Wharf, SYDNEY |
Proposed continuation of use of outdoor area for James Squire Brewhouse and Restaurant |
| 916 |
10-Jun-10 |
26-Feb-10 |
Determined |
John and Linda Lockett |
53 Minimbah Road NORTHBRIDGE |
S96 - Retain existing boatshed and shorten existing jetty; install pontoon, mooring iles for permanent berthing and davitt |
| 934 |
10-Jun-10 |
31-Mar-10 |
Determined |
Cranbrook School Boat Shed |
Vickery Road ROSE BAY |
Proposed repairs to existing shed, subdivision of land for long term lease. |
| 938 |
09-Jun-10 |
09-Apr-10 |
Determined |
National Mutual Life Nominees Ltd |
20 Windmill Street / 26 Hickson Road WALSH BAY |
Foyer Cafe |
| 952 |
09-Jun-10 |
20-May-10 |
Determined |
SP76902 - Brown Sugar Cafe at the Bay |
Shop 1, 9 Towns Place WALSH BAY |
For outdoor seating |
| 917 |
02-Jun-10 |
26-Feb-10 |
Determined |
Renewing Homebush Bay Pty Ltd |
40 Walker Street HOMEBUSH BAY |
Application for subdivision certificate for Stage 3 to create Development Lots, Opne Space Lots and Road Lots |
| 919 |
19-May-10 |
26-Feb-10 |
Determined |
Gary Johnston |
9 Toocooya Road HUNTERS HILL |
S96 - Modify DA338/97 - to increase the size of an existing mooring pen to accommodate 17.8m vessel |
| 937 |
18-May-10 |
31-Mar-10 |
Determined |
Strike NSW Pty Ltd |
22 The Promenade KSW SYDNEY |
S96 -Proposed modification to Consent for continuation of extended trading to 2am for external seating area |
| 939 |
20-May-10 |
09-Apr-10 |
Determined |
Tesrol Walsh Bay P/L |
30 Windmill Street Sydney |
Partitioning of levels 2 and 3 within Bond Store 3. Demolition of non-heritage parts on level 3. |
| 915 |
13-May-10 |
26-Feb-10 |
Determined |
Manly 16' Skiff Club |
Cnr Stuart St & East Esplanade MANLY |
TBC |
| 932 |
10-May-10 |
23-Mar-10 |
|
John Duncan (for the Cargo Bar) |
52-60 The Promenade King Street Wharf |
Proposed temporary installation of video screen for Soccer World Cup |
| 924 |
06-May-10 |
08-Mar-10 |
Determined |
Cargo Bar |
52-60 The Promenade King Street Wharf |
To operate a hotdog stand on the promenade |
| 925 |
04-May-10 |
03-Mar-10 |
Determined |
Sydney Seaplanes P/L |
Lyne Park Rose Bay (Old South Head Road) |
Alterations and additions to existing aviation terminal building |
| 877 |
|
27-Oct-09 |
Refused 30/04/2010 |
Mr Mark Fesq |
24 Louisa Road BIRCHGROVE |
Install 1 mooring pile and 2 mooring blocks to create a second mooring pen for permanent berthing of 6m vessel; install boat lift, brackets on existing skid; repair existing mooring pen including replacement of 4 mooring piles. |
| 897 |
12-Apr-2010 |
23-Dec-2009 |
Approved |
Owners Coporation SP54257 |
5-9 Baden Road, Neutral Bay |
Repairs to jetty and skid, replace existing steps, navigation aid, boat lift and install boatlift. |
| 909 |
12-Apr-2010 |
22-Jan-2010 |
Approved |
Susan Hope |
46A Louisa Road BIRCHGROVE |
Proposed construction of Jetty, Ramp, Pontoon and 4 Mooring Piles to create a permanenet mooring pen. |
| 931 |
12-Apr-2010 |
16-Mar-2010 |
Approved |
Owners Corporation SP69950 |
Suite 36, Jones Bay Wharf, 26-32 Pirrama Road PYRMONT |
Partial Removal of internal wall to join Suites 34 and 36 |
| 922 |
06-Apr-2010 |
19-Feb-2010 |
Approved |
John Duncan for Cargo Bar |
52-63 The Promenade, King Street Wharf, SYDNEY |
Temporary extension to licensed area of Cargo bar for additional 200 people for the next 5 Anzac Days for the period 2010 to 2014 |
| 930 |
01-Apr-2010 |
17/03/10 |
Approved |
Brookfield Multiplex Shelley Street Landowner Pty Ltd |
1 Shelley Street SYDNEY |
S96 Internal Modification to Retail 3, Stage 1, Ground Floor. |
| 918 |
01-Apr-2010 |
26/02/10 |
Approved |
The Owners Corporation Strata Plan 71494 |
6F Cowper Wharf Road WOOLLOOMOLOO |
Extension and internal Fit-out - China Doll Restaurant |
| 929 |
01-Apr-2010 |
17/03/10 |
Approved |
Brookfield Multiplex Shelley Street Landowner Pty Ltd |
1 Shelley Street SYDNEY |
S96 - Internal Modification to Basement 3 access (lift) doors |
| 633 |
01-Apr-2010 |
08/02/08 |
Withdrawn |
Yensit, Yensate, Yensate |
Rockley Street CASTLECRAG |
Replacement of Fixed Jetty with New Gangway and Floating Pontoon |
| 914 |
31-Mar-2010 |
17/02/10 |
Approved |
The Owners Strata Plan SP69546 |
Shop 3, Walsh Bay Pier 6/7, Hickson Road SYDNEY |
Change of use of premses from Real Estate to Bike Tour Office (with no internal changes) and serving refreshments. |
| 927 |
31-Mar-2010 |
10/03/10 |
Approved |
Tesrol Walsh Bay P/L |
Bond Store 3, 30 Windmill Street sydney |
Partitioning of basement and installation of 2 Air Conditioning units and 2 condensers |
| 908 |
30-Mar-2010 |
22/01/10 |
Approved |
The Owners Corporation - Strata Plan 80047 |
101 Yarranabbe Road, DARLING POINT |
Construction of additional floor joists and installation of the esisting boatshed |
| 904 |
26-Mar-2010 |
14/01/2010 |
Approved |
L Lenehan and G Schiller |
134 Louisa Road Birchgrove |
Replace mooring pen & jetty with new mooring pen and jetty |
| 920 |
24-Mar-2010 |
26/02/2010 |
Approved |
Biennale of Sydney |
13 Hickson Road Walsh Bay |
DA for Pier 2/3 Walsh Bay Sydney NSW |
| 891 |
11-Mar-2010 |
23/12/2009 |
Approved |
Rozelle Bay Pty Ltd |
29 & 30 James Craig Road, Rozelle Bay |
Modification to existing approval for dry stack storage |
| 889 |
10-Mar-2010 |
30/11/2009 |
Approved |
McMullen Marine Services Pty Ltd |
83 Parriwi Road MOSMAN |
S96 - Application to Modify Development Consent |
| 893 |
10-Mar-2010 |
23/12/2009 |
Approved |
Tony Costantino |
25 Dick Street, Henley |
Proposal to demolish existing iron slipway and replace new slipway; cradle and private landing steps. |
| 899 |
10-Mar-2010 |
01/12/2009 |
Approved |
Junni Desserts |
Hickson Road - WALSH BAY |
Internal Fit out of Café |
| 682 |
09-Mar-2010 |
20/06/2008 |
Approved |
Lavender Bay Boatshed |
23A King George LAVENDER BAY |
Upgrading of Existing Waterside Structures and Wet Berths |
| 880 |
05-Mar-2010 |
28/10/2009 |
Approved |
Mr P Cohen |
30 Cowdroy Avenue CAMMERAY |
Proposed mooring piles with dredging |
| 879 |
03-Mar-2010 |
28/10/2009 |
Approved |
CAMERONS MARINA PTY LTD |
5a Phoebe Street BALMAIN |
Extend existing marina |
| 892 |
03-Mar-2010 |
23/12/2009 |
Approved |
John Codling |
Manly Bathers Pavillion, West Esplanade, Manly |
Installation of signage |
| 862 |
02-Mar-2010 |
25/09/2009 |
Rejected |
Katharine Davis-Rice |
31 Carrington Avenue - CAMMERAY |
Demolish existing jetty and pontoon, extend existing slipway, install davit, dredging, construction of new jetty, ramp, ply and glass pontoon, mooring pen and skid with steps. |
| 873 |
25-Feb-2010 |
20-Oct-2009 |
Approved |
Spicey Caricorn P/L |
1 Ithaca Road ELIZABETH Bay |
Expansion of existing Marina to 40 floating berths, 40 commercial swing moorings and a small office and retail amenities.
Approval letter, Approved plans, Assessment report. |
| 880 |
25-Feb-2010 |
28-Oct-2009 |
Approved |
Mr P Cohen |
30 Cowdroy Avenue CAMMERAY |
Proposed mooring piles with dredging |
| 886 |
15-Feb-2010 |
16/11/2009 |
Approved |
Chill Seafood Restaurant |
West Esplanade, MANLY |
To extend hours from 8am - 8pm to 8am - 11pm |
| 884 |
2-Feb-2010 |
12/11/2009 |
Approved |
P and J Goode |
9 Bay View Street LAVENDER BAY |
Replacement of existing Sea Stairs with construction of new Gangway and Pontoon |
| 894 |
29-Jan-2010 |
23/12/2009 |
Approved |
Brookfield Multiplex |
1 Shelley Street, Sydney |
Application to fitout retail 3 |
| 895 |
29-Jan-2010 |
24/12/2009 |
Approved |
Brookfield Multiplex |
1-19 Shelley Street, Sydney |
Alterations to basement 3 shower facilities |
| 894 |
29-Jan-2010 |
23/12/2009 |
Approved |
Brookfield Multiplex |
1 Shelley Street, Sydney |
Application to fitout retail 3 |
| 895 |
29-Jan-2010 |
24/12/2009 |
Approved |
Brookfield Multiplex |
1-19 Shelley Street, Sydney |
Alterations to basement 3 shower facilities |
| 881 |
14-Jan-2010 |
10/11/2009 |
Approved |
Port Waratah Coal Services Pty Ltd |
Cormorant Road KOORAGANG |
Stage 4 Project incorporating a fourth shiploading stream and shiploader |
| 882 |
14-Jan-2010 |
11/11/2009 |
Approved |
Leda Holdings Pty Ltd |
16 Lodge Road CREMORNE |
Construction of a slipway |
| 852 |
23-Dec-2009 |
9/09/2009 |
Approved |
Cornelius |
32A Bay Street BEAUTY POINT |
Removal of existing skid & addition of slipway. |
| 888 |
22-Dec-2009 |
20/11/2009 |
Approved |
Simone Plenario (De Lorenzo Coffee) |
Bond Stores 5-7, 16-18 Hickson Road, DAWES POINT |
Proposed outdoor seating for 6 tables and 12 chairs |
| 853 |
18-Dec-2009 |
14/09/2009 |
Approved |
Strata Plan 21645 |
25 Battle Boulevarde, SEAFORTH |
Repair and restore existing structure to original condition. Including: berthing pen, pil;es, swimming area and all damaged timbers |
| 883 |
18-Dec-2009 |
11/11/2009 |
Approved |
Leda Holdings P/L |
16 Lodge Road CREMORNE |
Proposed remedial dredging |
| 878 |
20-Nov-2009 |
25/10/2009 |
Approved |
ABD Holdings Pty Ltd |
1 Towns Place - MILLERS POINT |
S96 POPE licence - Extension of evening trading hours |
| 799 |
20-Nov-2009 |
25-May-2009 |
Approved |
Scratchley's Pty Ltd |
200 Wharf Road NEWCASTLE |
Permission to lodge DA application with Council to convert 20 square metre office space to small Function Room. |
| 878 |
20-Nov-2009 |
25-Oct-2009 |
Approved |
ABD Holdings Pty Ltd |
1 Towns Place - MILLERS POINT |
S96 POPE licence - Extension of evening trading hours |
| 799 |
20-Nov-2009 |
25-May-2009 |
Approved |
Scratchley's Pty Ltd |
200 Wharf Road NEWCASTLE |
Permission to lodge DA application with Council to convert 20 square metre office space to small Function Room. |
| 849 |
17-Nov-2009 |
04-Sep-2009 |
Approved |
Oxley |
7 Sutherland Crescent DARLING POINT |
Demolish existing swimming pool, pump room, boat crane and concrete seawall; reduce height of concrete hardstand; new private landing steps with 4 timber sleeved piles, a new davit/boatlift |
| 855 |
16-Nov-2009 |
11-Sep-2009 |
Approved |
Trustees Marist Brothers |
14 Drummoyne Avenue DRUMMOYNE |
Repair and rebuild existing tidal pool sea wall. |
| 875 |
09-Nov-2009 |
15-Oct-2009 |
Approved |
Bangarra Dance Theatre |
Pier 4/5 15 Hickson Road WALSH BAY |
Application to renew POPE Licence |
| 850 |
06-Nov-2009 |
07-Sep-2009 |
Approved |
Lawman |
1ABligh Crescent SEAFORTH |
Application for the ongoing use of existing unauthorised timber skid and rigging deck |
| 869 |
06-Nov-2009 |
14-Oct-2009 |
Approved |
ABD Holdings |
1 Towns Place MILLERS POINT |
Use of Level 5, Munn Reserve POPE |
| 840 |
05-Nov-2009 |
14-Aug-2009 |
Approved |
Double Bay Marina |
8 Castra Place DOUBLE BAY |
Upgrading the existing Marina in Double Bay |
| 789 |
02-Nov-2009 |
20-Apr-2009 |
Approved |
Jonnie Kennedy and Nicolas McDonald |
24A The Point Road WOOLWICH |
Application to modify a development consent in respect of the proposed development of alterations to existing watercraft facilities. |
| 864 |
02-Nov-2009 |
02-Oct-2009 |
Approved |
Susan Walter |
50 Cowdroy Avenue CAMMERAY |
S96(1) to modify consent 722/08 - typing error |
| 861 |
30-Oct-2009 |
07-Oct-2009 |
Approved |
R Parkinson |
36 Cowdroy Avenue CAMMERAY |
Ramp, stub jetty, pontoon, mooring pen replacement, retain existing jetty repair and ongoing repairs where necessary |
| 870 |
30-Oct-2009 |
19-Oct-2009 |
Approved |
Baileys Marine |
White Bay Wharf 6, off Grafton Street BALMAIN |
S96(1a) application to delete Condition 4 of Consent - Extend Lapse Date to 31 Dec 2020 |
| 872 |
30-Oct-2009 |
14-Oct-2009 |
Approved |
ABD Holdings |
1 Towns Place MILLERS POINT |
Glass Awning Repairs |
| 858 |
28-Oct-2009 |
18-Sep-2009 |
Approved |
1st Mosman 1908 Scout Group |
The Esplanade, MOSMAN |
Repairs to existing Boatshed, including new decking timbers and repairs to bearers and joists of existing boat ramp |
| 867 |
28-Oct-2009 |
13-Oct-2009 |
Approved |
Rose Bay Marina |
Old South Head Road ROSE BAY |
S961a Application to extend Arm |
| 868 |
28-Oct-2009 |
13-Oct-2009 |
Approved |
Point piper Marina |
5 Wunulla Road POINT PIPER |
S961a Application to extend Arm and widen walkway |
| 866 |
27-Oct-2009 |
08-Oct-2009 |
Approved |
Newington College |
14 Checkley Street Abbotsford |
Replacement of Pontoon at Newington School Rowing Facility |
| 829 |
26-Oct-2009 |
31-Jul-2009 |
Approved |
Waddell |
72 Champion Road GLADESVILLE 2111 |
Timber Skid |
| 831 |
26-Oct-2009 |
14-Aug-2009 |
Approved |
Hung & Hegarty |
12 Wonga Road CREMORNE |
Steps added to the side of the existing pontoon and a davit added to an existing jetty. |
| 830 |
20-Oct-2009 |
31-Jul-2009 |
Approved |
Houston |
Apt 120 Pier 6/7, 19 Hickson Road WALSH BAY |
Apt 120 Pier 6/7, 19 Hickson Road Walsh Bay by the consolidation (by way of Strata plan of subdivision) of lots 10 x 18, SP69906 (attached documents) |
| 842 |
20-Oct-2009 |
27-Aug-2009 |
Approved |
Systzer Australasia Pty Ltd |
Tug Berth at Dyke Point |
Proposed additions and alterations to the existing tug berth at Dyke Point |
| 865 |
15-Oct-2009 |
25-Sep-2009 |
Approved |
Macquarie Group |
1 Shelley Street SYDNEY |
S96(1a) Relocation of 2 offices and tea point |
| 871 |
15-Oct-2009 |
15-Oct-2009 |
Approved |
Sense Event Group |
6 Cowper Wharf Road |
Application to locate a temporary pontoon adjacent to the Woolloomooloo Wharf for a single event on Thursday 29 Oct 09 |
| 863 |
13-Oct-2009 |
02-Oct-2009 |
Approved |
Latin Phoenix Production (La Cita Restaurant) |
9 Lime Street KING STREET WHARF (Sydney) |
S96 to modify trading hours Consent |
| 839 |
07-Oct-2009 |
12-Aug-2009 |
Approved |
Mr Torpy |
15 Shellbank Avenue |
s96 Modification |
| 854 |
07-Oct-2009 |
10-Sep-2009 |
Approved |
James Squires Brewhouse and Restaurant |
The Promenade King Street Wharf, DARLING HARBOUR |
Installation of additional Shade Umbrellas |
| 845 |
02-Oct-2009 |
16-Sep-2009 |
Approved |
Middle Harbour Yacht Club |
Lower Parriwi Road The Spit Mosman |
Relocation of bistro kitchen and refurbishment of Sand Bar |
| 847 |
02-Oct-2009 |
27-Aug-2009 |
Approved |
Australian Theatre for Young People |
Pier 4/5 Hickson Road |
Office upgrade and fit out on the internal mezzanine level of the "Shoreshed" |
| 857 |
02-Oct-2009 |
15-Sep-2009 |
Approved |
Brookfield Multiplex |
The Promenade King Street Wharf, DARLING HARBOUR |
2009 Melbourne Cup Event - temporary set up of Marquees |
| 859 |
02-Oct-2009 |
18-Sep-2009 |
Approved |
John Duncan (for the Cargo Bar) |
The Promenade King Street Wharf, DARLING HARBOUR |
Renewal of POPE license |
| 825 |
29-Sep-2009 |
23-Jul-2009 |
Approved |
Matheson |
58 Wentworth Road VAUCLUSE |
Timber Skid |
| 843 |
29-Sep-2009 |
21-Aug-2009 |
Approved |
Harbour Radio Pty Ltd |
3 Burroway Road, Homebush Bay |
Removal of Radio Tower |
| 844 |
29-Sep-2009 |
27-Aug-2009 |
Approved |
Abd Holdings (I Love Thai Restaurant) |
1 Towns Place, Millers Point |
Minor internal decorative alterations |
| 846 |
29-Sep-2009 |
24-Aug-2009 |
Approved |
D and L Taylor |
19 Hickson Road, Dawes Point |
Consolidation of Units 59 & 60 (Units 321 and 322) |
| 841 |
18-Sep-2009 |
24-Aug-2009 |
Approved |
Mrs Davis-Rice |
31 Carrington Avenue MOSMAN |
Demolition concrete pool deck and replace with new; infill of existing stair from pool deck to boatshed and replace with new external hardwood stair; replace hardwood stair; infill boatshed doorway and replace roller shutters; replace pipe metal fence on pool deck with new glass balustrading to A.S |
| 837 |
17-Sep-2009 |
25-Aug-2009 |
Approved |
TMG Developments Pty Ltd |
Manly Wharf Management Office East Esplanade MANLY |
Build existing Gloria Jeans Kiosk |
| 833 |
16-Sep-2009 |
17-Aug-2009 |
Approved |
Hopetoun Quays Community Association |
8 Water Street Birchgrove |
Hopetoun Quays Wharf Refurbishment |
| 809 |
15-Sep-2009 |
05-Jun-2009 |
Approved |
Jones Bay Wharf P/L |
19-21 Pirrama Road Jones Bay Wharf PYRMONT |
Proposed expansion of existing Marina at Jones Bay Wharf. |
| 781 |
10-Sep-2009 |
02-Apr-2009 |
Approved |
Mr Winning |
32B Pacific Street WATSONS BAY |
Land Owners Consent to lodge DA to authorise existing iron slipway atop of concrete ramp, installation of a new steel cradle and approval of existing winch and waste system |
| 810 |
10-Sep-2009 |
09-Jun-2009 |
Approved |
Simon Goubran |
14 The Avenue LINLEY POINT |
Construction of waterfront access stairs |
| 811 |
10-Sep-2009 |
16-Jun-2009 |
Approved |
G & L Stenning |
24 Abernethy Street SEAFORTH |
Proposed construction of 2 piles adjacent to existing pontoon |
| 817 |
10-Sep-2009 |
25-Jun-2009 |
Approved |
Neighbourhood Association DP285011 |
39 – 93 Hilly Street, MORTLAKE. |
Permission to lodge S96 application to modify consent 4/91 for alterations and additions to private marina. |
| 832 |
10-Sep-2009 |
17-Aug-2009 |
Approved |
Mrs Carolyn Boboff |
79 Fitzwilliam Road, VAUCLUSE. |
S96 to modify Development Consent for construction of timber skid. |
| 834 |
10-Sep-2009 |
11-Aug-2009 |
Approved |
Ms D A Hazelton |
117 Louisa Road, BIRCHGROVE. |
S96(1) Application to delete Condition 6(iii) – Proof of ownership. |
| 835 |
02-Sep-2009 |
24-Aug-2009 |
Approved |
Sydney Theatre Company |
Pier 4/5 Hickson Road DAWES POINT (WALSH BAY) |
Temporary construction of internal Mezzanine viewing platform |
| 836 |
31-Aug-2009 |
18-Aug-2009 |
Approved |
Sydney Theatre Company |
Pier 4/5 Hickson Road DAWES POINT (WALSH BAY) |
Temporary construction of internal Mezzanine viewing platform |
| 821 |
30-Aug-2009 |
02-Jul-2009 |
Approved |
Unity Resources Group |
6 Towns Place North, WALSH BAY |
Office fit out and external works |
| 782 |
28-Aug-2009 |
02-Apr-2009 |
Approved |
Wolman |
70-72 Wolseley Road POINT PIPER |
Application for repairrs and refurbishment to existing jetty; repair/part replacement of mooring pen; new 6M x 1.2m aluminium ramp; new 2.5mx 6m pontoon; 70 cubic metre volume of dredging |
| 785 |
28-Aug-2009 |
03-Apr-2009 |
Approved |
Peng & Li Xiong Liang |
10 Shellbank Parade CREMORNE |
Replace 2 Jetties & Damaged Pile with 2 new Piles and New Jetty, Ramp and Pontoon |
| 794 |
28-Aug-2009 |
24-Apr-2009 |
Approved |
Mr Ell |
29 Shellbank Avenue CREMORNE |
Increase in size of an existing mooting pen to accommodate berthing of an 18m vessel; reorientation/minor rotation of existing ramp and pontoon. |
| 796 |
28-Aug-2009 |
29-Apr-2009 |
Approved |
Ryan |
11 Point Road NORTHWOOD |
Construction of a rigging deck, timber skid and two mooring piles. |
| 786 |
20-Aug-2009 |
16-Apr-2009 |
Approved |
Cruising Yacht Club of Australia |
1 New Beach Road DARLING POINT |
To lodge DA for proposed alterations and additions to existing facilities including: extension of ARM "D" to accommodate vessels up to 60 feet; extension of existing concrete hardstand over the slipway; replace timber deck to the North of the slipway wih |
| 816 |
20-Aug-2009 |
24-Jun-2009 |
Approved |
Paul and Vicki Clitheroe |
25 Elamang Avenue KIRRIBILLI |
Proposed 3 Mooring Piles with minor drdging for permanent mooring |
| 823 |
12-Aug-2009 |
20-Jul-2009 |
Approved |
Sydney Theatre Company |
15A Hickson Road, DAWES POINT |
Renewal POPE Licence |
| 824 |
12-Aug-2009 |
20-Jul-2009 |
Approved |
Sydney Theatre Company |
15A Hickson Road, DAWES POINT |
Refurbishment of Technical Offices and Storage Area |
| 827 |
07-Aug-2009 |
23-Jul-2009 |
Approved |
Brookfield Multiplex Shelley Street Landowner Pty Ltd. |
1 – 19 Shelley Street, SYDNEY. |
Internal Modification to Basement Level 3 |
| 828 |
07-Aug-2009 |
23-Jul-2009 |
Approved |
Brookfield Multiplex Shelley Street Landowner Pty Ltd. |
1 – 19 Shelley Street, SYDNEY. |
Change of use to a cafe and restaurant bar and internal alterations |
| 770 |
06-Aug-2009 |
02-Mar-2009 |
Approved |
Attia |
53 Abbotsford Road ABBOTSFORD |
25/03/09 - Removal of existing Jetty & construction of four mooring piles with dredging. |
| 826 |
06-Aug-2009 |
23-Jul-2009 |
Approved |
Brookfield Multiplex Shelley Street Landowner Pty Ltd. |
1 – 19 Shelley Street, SYDNEY. |
Installation of 3 Totem Pole Signage Posts. |
| 812 |
03-Aug-2009 |
12-Jun-2009 |
Approved |
The Wharf at Woolloomooloo Pty Ltd |
10 Lincoln Crescent WOOLLOOMOLOO |
Automation of existing commercial cae park, removal of existing portable bathroom, Strata subdivision of spaces to residential parking |
| 815 |
03-Aug-2009 |
18-Jun-2009 |
Approved |
Pier One Development |
11 Hickson Road DAWES POINT |
Proposed additional rooms, relocation of offices/staff amenitiesarea and redesign of conferencing area on the ground floor |
| 819 |
03-Aug-2009 |
02-Jul-2009 |
Approved |
National Mutual Life Nominees |
Ground Floor, 26 Hickson Road, MILLERS POINT |
Proposed Internal fit out for retail outlet at Ground Level |
| 820 |
03-Aug-2009 |
03-Jul-2009 |
Approved |
Brookfield Multiplex Shelley Street Landowner Pty Ltd |
1 Shelley Street SYDNEY |
Construction of Gymnasium in basement level |
| 822 |
03-Aug-2009 |
17-Jul-2009 |
Approved |
TMG Developments Pty Ltd |
Shop 12-13 Manly Wharf, East Esplanade, MANLY. |
Retail refurbishment including replacement of existing signage. |
| 818 |
31-Jul-2009 |
25-Jun-2009 |
Approved |
Mr John Codling |
West Esplanade, Manly Pavilion, MANLY |
Proposed internal alterations, fit out and minor additions |
| 838 |
11-Jul-2009 |
11-Jul-2009 |
Approved |
Sydney Ports Corporation |
Port Botany – Banksmeadow |
S96(1A) - Modification: Additional Ship turning area dredging. |
| 814 |
09-Jul-2009 |
17-Jun-2009 |
Approved |
TMG Developments Pty Ltd |
Manly Wharf, East Esplanade MANLY |
Proposed construction of new Kiosk in transit corridor area |
| 813 |
09-Jul-2009 |
18-Jun-2009 |
Approved |
Arthur Lo |
5 Lime Street- KSW - Sydney |
Office refurb Lot 31 Suite 431, 5 Lime Street KSW |
| 808 |
23-Jun-2009 |
05-Jun-2009 |
Approved |
Dance Academy Productions |
Pier 2/3 Hickson Road, WALSH BAY , SYDNEY |
Application for low impact filming |
| 806 |
20-Jun-2009 |
21-May-2009 |
Approved |
Thiess Services |
40 Walker Street RHODES |
S96 (1A) application for transportation of cantaminated fill material from Allied Feed to Lednez site |
| 805 |
04-Jun-2009 |
18-May-2009 |
Approved |
Sydney Theatre Company |
Wharf 4/5, 15 Hickson Road, Walsh Bay SYDNEY |
S96 Application to Modify a consent for Wharf 2 Theatre seating configuration |
| 788 |
03-Jun-2009 |
20-Apr-2009 |
Approved |
The Hugo's Group |
Manly Wharf, East Esplanade MANLY |
S96 Application to extend seating for Hugo's Restaurant along south-western corner of manly Wharf |
| 792 |
02-Jun-2009 |
22-Apr-2009 |
Approved |
Sydney Theatre Company |
Wharf 4/5, 15 Hickson Road, Walsh Bay SYDNEY |
Application to renew Place of Public Entertainment Licence - POPE/8/2006. |
| 807 |
02-Jun-2009 |
26-May-2009 |
Approved |
Brookfield Multiplex |
1 Shelley Street - KSW - SYDNEY |
Application for change of use and minor internal alterations that comprise a fit out for a café on the ground floor in the North Eastern corner of the building |
| 751 |
01-Jun-2009 |
04-Feb-2009 |
Approved |
Ng |
Lot 210, 196 Lime Street, KSW SYDNEY |
Change of seating arrangements |
| 777 |
01-Jun-2009 |
18-Mar-2009 |
Approved |
Dexus Funds Management |
20 Windmill Street - BOND STORE 1 MILLERS POINT |
Installation of a "P" (Parking) sign on front of an existing building |
| 784 |
01-Jun-2009 |
07-Apr-2009 |
Approved |
Jones Bay Wharf SP69951 |
19-21 Pirrama Road Jones Bay Wharf PYRMONT |
Installation of 2 Pre-Fabricated security huts on the south end of both lower and upper decks for traffic management, together with 2 pedestrian directory boards. |
| 801 |
01-Jun-2009 |
16-May-2009 |
Approved |
Mafi |
La Cita Restaurant - King Street Wharf DARLING HARBOUR |
Proposed installation of retractable roofing to be added to existing structure |
| 793 |
29-May-2009 |
14-Apr-2009 |
Approved |
Tesrol Group of Companies |
30 Windmill Street MILLERS POINT |
Partitioning to Basement (Level 2) of Bond Store 3 and relocation of existing air conditioning unit |
| 798 |
29-May-2009 |
05-May-2009 |
Approved |
Fung |
1 Pottinger Street MILLERS POINT |
Subdivision of Lot 10 Strata Plan 70152 into 2 separate lots being Lot 31 and Lot 32 (Carspaces) |
| 800 |
29-May-2009 |
07-May-2009 |
Approved |
The Wharf at Woolloomooloo Pty Ltd |
10 Lincoln Crescent WOOLLOOMOLOO |
Application to convert 3 surplus parking lots into common property within the private carpark of Strata Plan 57623 |
| 791 |
27-May-2009 |
22-Apr-2009 |
Approved |
Gintel |
19-21 Pirrama Road Jones Bay Wharf PYRMONT |
Removal of part of an internal wall between (adjoining) Suite 36 & Suite 38. |
| 797 |
26-May-2009 |
29-Apr-2009 |
Approved |
Strata Plan 76902 |
1 Towns Place MILLERS POINT |
Installation of signage at courtyard entrance |
| 771 |
15-May-2009 |
02-Mar-2009 |
Approved |
The Sydney Writers' Festival Pty Ltd |
Pier 2/3 Hickson Road, WALSH BAY , SYDNEY |
Set up temporary event related infrastructure on Lot 65/DP/SP 1048377 - Piers 2/3 & 4/5 Walsh Bay for the Sydney Writers' Festival- Sunday May 18-24th 2009 |
| 780 |
15-May-2009 |
25-Mar-2009 |
Approved |
ARTS NSW |
Wharf 4/5, 15 Hickson Road, Walsh Bay SYDNEY |
Application to modify Land Owners Consent - (refer previous PTL760) addition of an internal bridge |
| 787 |
29-Apr-2009 |
15-Apr-2009 |
Approved |
National Mutual Life Nominees Ltd |
20 Windmill Street - BOND STORE 1 MILLERS POINT |
Internal Fitout of Level 6 BOND 1 |
| 747 |
24-Apr-2009 |
19-Jan-2009 |
Refused |
Hill |
33A Battle Boulevarde SEAFORTH |
Existing marine facility deliting existing sea stairs moving pen and adding ramp and pontoon. Refused due to: hydrographical data has been submitted by a non certified hydrographical surveyor. |
| 766 |
20-Apr-2009 |
25-Feb-2009 |
Approved |
Mastronardo |
8A Pile Street GLADESVILLE |
Application to Modify a Consent for the proposed development of installation of 2 mooring piles to increase size of approved mooring pen |
| 779 |
15-Apr-2009 |
10-Mar-2009 |
Approved |
888 Projects Pty Ltd |
4-6 Walton Crescent ABBOTSFORD |
Proposed new multible berth floating moorings and demolition of existing wharf and single mooring pile |
| 776 |
03-Apr-2009 |
19-Mar-2009 |
Approved |
Thiess Services |
40 Walker Street RHODES |
S96 (1A) - Importation of contaminated residual wast from adjoining site;importation of contaminated fill material from adjoining site. |
| 729 |
01-Apr-2009 |
14-Nov-2008 |
Approved |
Johnston |
9 Toocooya Road HUNTERS HILL |
2 mooring piles to enable an increase in size of an existing mooring pen to accommodate larger vessel. All 4 Piles to be changed from turpentine to steel encased in polyethylene sleeves. |
| 739 |
01-Apr-2009 |
17-Dec-2008 |
Approved |
Howarth |
25 Dick Street HENLEY |
Demolition of slipway & replace with new; demolish private landing steps and replace with new; repairs to seawall |
| 774 |
01-Apr-2009 |
12-Mar-2009 |
Approved |
G Krelle & L Lawson |
7 & 9 Kareelah Road HUNTERS HILL |
S96 - Application to modify staircase design. |
| 601 |
31-Mar-2009 |
27-Nov-07 |
Approved |
Land Sea Air P/L |
1 Bradley Avenue KIRRIBILLI |
Refurbishment of Existing Mooring Pens |
| 778 |
27-Mar-2009 |
20-Mar-2009 |
Approved |
Mediterranean Shipping Company (Aust) Pty Ltd |
Lime Street KSW - SYDNEY |
PTL Minor exterior modification of existing half height wall with windows to full height sliding door with sidelite to access balcony. |
| 759 |
26-Mar-2009 |
13-Feb-2009 |
Approved |
Haertsch |
32 Cowdroy Avenue CAMMERAY |
Partial demolition wharf & 8 piles, demolish skid/ramp; maintenance dredging, new timber stub jetty, widen deck to 1.5m to match; new timber ramp & pontoon, 4 mooring poles and pen, repair boatshed and decking |
| 753 |
25-Mar-2009 |
03-Feb-2009 |
Approved |
Strata Plan #12915 |
5 Coolong Road VAUCLUSE |
Wooden Skid on Brick Piles |
| 756 |
25-Mar-2009 |
09-Feb-2009 |
Approved |
Graham |
131A Seaforth Crescent SEAFORTH |
Consent for previous PTL 664 expired Nov 08; applying for consent to make DA to Manly Council for the repair of wharf at Seaforth Cresc. |
| 767 |
25-Mar-2009 |
26-Feb-2009 |
Approved |
Staples |
42-48 The Promenade, KSW SYDNEY |
Restaurant footpath seating/renewal of lapsed consent "Casa Di Nico" Restaurant |
| 768 |
25-Mar-2009 |
26-Feb-2009 |
Approved |
Staples |
34 The Promenade, KSW SYDNEY |
Restaurant Footpath seating/ renewal of lapsed Consent "Nicks Seafood Bar & Grill" |
| 769 |
25-Mar-2009 |
26-Feb-2009 |
Approved |
Staples |
42-48 The Promenade, KSW SYDNEY |
Extension of Exisitng footpath seating "Casa di Nico" Restaurant |
| 721 |
23-Mar-2009 |
29-Oct-2008 |
Approved |
Short |
83 Parriwi Road MOSMAN |
Alterations to 1st floor Fergusons boatshed. |
| 773 |
23-Mar-2009 |
11-Mar-2009 |
Approved |
The Beverage Boys |
5-15 Lime Street THE ROCKS |
S96 renewal of Place of Public Entertainment |
| 775 |
23-Mar-2009 |
13-Mar-2009 |
Approved |
Kelly |
8a Drummoyne Avenue DRUMMOYNE |
Permission to lodge modification to condition A of original DA 706/08 |
| 742 |
12-Mar-2009 |
03-Dec-2008 |
Approved |
Tobiano |
11A Dorset Road NORTHBRIDGE |
Installation of new boatshed and boatlift |
| 762 |
12-Mar-2009 |
16-Feb-2009 |
Approved |
The Sydney Writers' Festival |
Pier 2/3 Hickson Road, WALSH BAY , SYDNEY |
Pier 2/3 - Set up temporary venues for SYDNEY WRITERS FESTIVAL: May 18th -24th 2009 |
| 744 |
10-Mar-2009 |
03-Dec-2008 |
Approved |
Fite & Danita Lowes |
10 Poole Street LONGUEVILLE |
Installation of landing steps fronting existing swimming pool |
| 772 |
10-Mar-2009 |
19-Feb-2009 |
Approved |
De Saxe |
33 Carrington Avenue MOSMAN |
Replace jetty emd with ramp, pontoon and 4 mooring piles |
| 754 |
09-Mar-2009 |
03-Feb-2009 |
Approved |
Smith's Spit Boatshed Pty Ltd |
81 Parriwi Road MOSMAN |
Application to Modify a DA in respect of Smith's Boatshed |
| 761 |
09-Mar-2009 |
11-Feb-2009 |
Approved |
Aaron Shaw Sydney Seaplanes |
Lyne Park ROSE BAY |
Refer Previous DA 739/08 - increase pontoon size and configuration; change in level of dredging batters; change from 1in 5 to 1 in 6 and additional dredging;minor repairs to existing jetty;new lease area |
| 764 |
03-Mar-2009 |
25-Feb-2009 |
Approved |
Strike NSW Pty Ltd |
21 Lime Street KING STREET WHARF |
S96 - application to continue extended trading hours |
| 741 |
27-Feb-2009 |
22-Dec-2008 |
Approved |
Kaplan |
68B Woolwich Road WOOLWICH |
Jetty, ramp, pontoon & four mooring piles |
| 736 |
25-Feb-2009 |
15-Dec-2008 |
Approved |
Blanche |
24A & 24B Wonga Road CREMORNE |
A shared facility, ramp, pontoon and four fender piles |
| 733 |
20-Feb-2009 |
25-Nov-2008 |
Approved |
Thompson |
2 Laura Street SEAFORTH |
4 mooring piles to create permanent mooring pen |
| 763 |
19-Feb-2009 |
18-Feb-2009 |
Approved |
Watts |
1 Shelley Street - KSW - SYDNEY |
Internal Fit Out only (no external changes)- Barber Shop (Unit 2) |
| 734 |
18-Feb-2009 |
15-Dec-2008 |
Approved |
Parramatta City Council & Ryde City Council |
Wharf Road ERMINGTON |
Widening of existing boatramp & Archer Park Wharf Road Ermington |
| 737 |
18-Feb-2009 |
15-Dec-2008 |
Approved |
Pirello |
2 Walton Crescent ABBOTSFORD |
5 Berth Private Marina |
| 735 |
16-Feb-2009 |
15-Dec-2008 |
Approved |
Sydney Amateur Sailing Club |
1 Green Street CREMORNE |
Replacement of 3 existing wharf piles & 4 freestanding mooring piles |
| 732 |
02-Feb-2009 |
25-Nov-2008 |
Approved |
Strata Plan 17636 |
37 Carrington Avenue MOSMAN |
Install 4 Mooring piles to create permanent mooring pen |
| 750 |
02-Feb-2009 |
01-Feb-2009 |
Approved |
Flanagan |
1 Shelley Street - KSW - SYDNEY |
Section 96(1A) Application to modify Development Consent D/2007/2383- Commercial Fitout |
| 757 |
30-Jan-2009 |
9/02/2009 |
Approved |
Trust Company Ltd |
Dalbora Marina - The Spit, MOSMAN |
Expansion and redevelopment of Marina |
| 743 |
30-Jan-2009 |
03-Dec-2008 |
Approved |
James |
3 Wharf Road LONGUEVILLE |
Repair and reinstatement of existing jetty including timber pier replacement, retain part of the decking and 50% of the joists. Demolition of existing slipway |
| 745 |
16-Jan-2009 |
05-Jan-2009 |
Approved |
Codling |
Manly Pavillion, West Esplanade MANLY |
Alterations, fit out and minor alterations to the Manly Bathers Pavilion, West Esplenade Manly |
| 738 |
12-Jan-2009 |
17-Dec-2008 |
Approved |
Sydney Theatre Company |
20 Hickson Road, Walsh Bay, SYDNEY |
Application to renew POPE licence |
| 746 |
12-Jan-2009 |
08-Jan-2009 |
Approved |
Ageis Media c/o - incorp interior designs Pty Ltd |
20 Windmill Street - BOND STORE 1 MILLERS POINT |
Fitout of level 2 & 3 Bond One |
| 728 |
18-Dec-2008 |
11-Nov-2008 |
Approved |
Curtin |
18a Musgrave Street MOSMAN |
Replacement skid & two fender piles |
| 740 |
18-Dec-2008 |
18-Dec-2008 |
Approved |
Pennna |
21 Dick Street HENLEY |
Construction of a 1.5 metre connecting deck to facilitate the sharing of pontoon and jetty. |
| 749 |
12-Dec-2008 |
11-Dec-2008 |
Approved |
Moraitis |
1 Shelley Street - KSW - SYDNEY |
Proposal for Stratum Sub Division for Macquarie Bank Building |
| 726 |
02-Dec-2008 |
14-Nov-2008 |
Approved |
Dawes Point Pty Ltd |
16-18 Hickson Road, Walsh Bay - SYDNEY |
Wine Bar and restaurant |
| 724 |
01-Dec-2008 |
11-Nov-2008 |
Approved |
Brooklyn Home Units Pty Ltd |
23 Waruda Street KIRRIBILLI |
Alterations and additions to dwelling including new paved seating area, plantint on leased land and extend existing fence |
| 730 |
01-Dec-2008 |
21-Nov-2008 |
Approved |
Bell |
12 Lime Street SYDNEY |
Commercial Office Fitout |
| 731 |
01-Dec-2008 |
24-Nov-2008 |
Approved |
Newcastle Rowing Club |
50A Tully Street CARRINGTON |
Reduction in size of building from 2 storys to 1 |
| 725 |
26-Nov-2008 |
12-Nov-2008 |
Approved |
IHMS Pty Ltd T/A Blue Sydney Ataj Hotel |
6 Cowper Wharf Road WOOLLOOMOOLOO |
Variation to liquor license |
| 723 |
19-Nov-2008 |
04-Nov-2008 |
Approved |
Kenedy - Simmer on the Bay |
Pier 2/3 Hickson Road, WALSH BAY , SYDNEY |
Proposed erection of temporary structures & use of a section of Pier 2/3 Apron for a private function on 5th December 2008 from 6:30pm to 11:00pm |
| 715 |
14-Nov-2008 |
26-Sep-2008 |
Approved |
Schirato Pty Ltd |
119 Louisa Road BIRCHGROVE |
Replace existing non BCA compliant steel stair with complying steel spiral stair for safety & amenity. |
| 722 |
13-Nov-2008 |
04-Nov-2008 |
Approved |
PLW Investments Pty Ltd & ATF PLW Investment Trust |
Lot 23 James Craig Road ROZELLE |
Relocation of exising building for a proposed new administration and operations base for Australian Wharf and Bridge Marine Contractors |
| 709 |
10-Nov-2008 |
03-Sep-2008 |
Approved |
Leda Holdings Pty Ltd |
16,18 & 20 Lodge Road CREMORNE |
Jetty Ramp Ponton and Four Fender Piles |
| 708 |
05-Nov-2008 |
03-Sep-2008 |
Approved |
Marshall |
3 Wolseley Crescent POINT PIPER |
Repairs and Alterations to Existing Swimming Pool |
| 716 |
31-Oct-2008 |
10-Oct-2008 |
Approved |
Grinham |
148 Cammeray Road CAMMERAY |
Landscaping works on foreshore land |
| 720 |
31-Oct-2008 |
29-Oct-2008 |
Approved |
Telstra c/o- Angelini Planning Services |
WHARF 3 - Alfred Street CIRCULAR QUAY |
Temporary mobile phone base for new years eve 2008 celebtrations |
| 712 |
30-Oct-2008 |
12-Sep-2008 |
Approved |
Owen |
11 Raglan Street MOSMAN |
Rigging Deck, Jetty, Ramp, & Pile located pontoon |
| 711 |
29-Oct-2008 |
15-Sep-2008 |
Approved |
Mosman Rowing Club Inc |
Spit Reserve PEARL BAY |
S96 - Application to Modify Consent DA 8.2007.433 to Change the Accessible Ramping System |
| 719 |
29-Oct-2008 |
21-Oct-2008 |
Approved |
Greenslip T/A Cargo Bar |
52-60 The Promenade KSW SYDNEY |
To allow for additional toilets on New Years Eve 2008/2009 |
| 718 |
16-Oct-2008 |
16-Oct-2008 |
Approved |
Flanagan |
1 Shelley Street - KSW - SYDNEY |
Application for modificaiton of Stage 2 Development Consent DA2006/1802/A for the 1 Shelley St Site |
| 717 |
12-Oct-2008 |
12-Oct-2008 |
Approved |
Flanagan |
1 Shelley Street - KSW - SYDNEY |
Stratum Subdivision for the Macquarie Bank Building |
| 714 |
10-Oct-2008 |
23-Sep-2008 |
Approved |
Manly 16ft Skiff Sailing Club |
East Esplanade MANLY |
Alterations and Additions to Windows |
| 695 |
08-Oct-2008 |
24-Jul-2008 |
Approved |
Lowy |
39 Coolong Road VAUCLUSE |
Installation of Private Landing Steps |
| 713 |
26-Sep-2008 |
19-Sep-2008 |
Approved |
Tesrol Walsh Bay Pty Ltd |
30 Windmill Street MILLERS POINT |
Installation of Optus Mobile "DAS" Communications System |
| 706 |
25-Sep-2008 |
26-Aug-2008 |
Approved |
Sargeant |
308 Edinburgh Road CASTLECRAG |
Timber Slipway/skid |
| 710 |
24-Sep-2008 |
09-Sep-2008 |
Approved |
Mahadevan |
6 Cowper Wharf Road WOOLLOOMOOLOO |
Installation of Retractable Awning to Aki's Indian Restaurant |
| 697 |
19-Sep-2008 |
04-Aug-2008 |
Approved |
Neighbourhood Association DP285011 |
39-93 Hilly Street MORTLAKE |
Installation of Platform Ramp and Pontoon Attached to an Existing Fixed Timber Jetty |
| 702 |
18-Sep-2008 |
14-Aug-2008 |
Approved |
Fite |
65 The Point Road WOOLWICH |
Partial Demolition of Existing Skid Installation of Ramp Deck and Piles - Private Landing Facility for Private Casual Mooring |
| 803 |
16-Sep-2008 |
14-May-2009 |
Approved |
Owners Corporation Strata Plan 81620 |
10 Walton Crescent ABBOTSFORD |
Construction of a 2 permanent berth marina comprising jetty, ramp, pontoon and 6 mooring piles |
| 705 |
09-Sep-2008 |
01-Sep-2008 |
Approved |
Lewis Hotels (Kogarah) Pty Ltd |
23 Shelley Street SYDNEY |
Boundary Adjustment Lots 107 and 151 (Units 1005 and 1404) |
| 707 |
09-Sep-2008 |
04-Sep-2008 |
Approved |
Cope |
Wharves - King Street Wharf SYDNEY |
Melbourne Cup Day Activities 2008 - Promenade and Adjacent Areas King Street Wharf |
| 687 |
08-Sep-2008 |
14-Jul-2008 |
Approved |
Blue Water Corporate Pty Ltd |
5 Wunulla Road POINT PIPER |
Redevelopment of Marina Section Involving Removal of Existing 23 Fixed Berths and Construction of a New 35 Berth Floating Marina |
| 688 |
08-Sep-2008 |
14-Jul-2008 |
Approved |
Rose Bay Marina Pty Ltd |
594 New South head Road ROSE BAY |
Marina Redevelopment Involving Removal of Existing 29 Fixed Berths and Construction of New 81 Berth Floating Marina |
| 696 |
08-Sep-2008 |
30-Jul-2008 |
Refused |
Revy Investments |
19-21 Pirrama Road Jones Bay Wharf PYRMONT |
Commerical Marina facility - comprising two stub jetties, two gangways, a series of floating pontoons, restained by piles and a sewage pumpout facility and an assocaited office. Consent refused as proposed development is not subject to an agreed tenure arrangement or similar arrangement |
| 704 |
08-Sep-2008 |
27-Aug-2008 |
Approved |
Balmain Rowing Club Inc |
White Street BALMAIN |
Alterations and Additions to Existing Club Facilities Including Pathways and Roadworks |
| 693 |
03-Sep-2008 |
24-Jul-2008 |
Approved |
Shell Refining (Australia) Ltd |
9 Devon Stret ROSEHILL |
Alterations to Existing Boatshed and Boat Lift Device |
| 683 |
29-Aug-2008 |
07-Jul-2008 |
Approved |
Lewin |
22A Tivoli Avenue ROSE BAY |
Seawall Repairs and Landscaping |
| 698 |
28-Aug-2008 |
04-Aug-2008 |
Approved |
Charlton |
367 Edinbutgh Road CASTLECRAG |
Repair and Raise Seawall Demolish Boatshed and Skid Install New Slipway |
| 700 |
25-Aug-2008 |
06-Aug-2008 |
Approved |
Walsh Bay Finanace Pty Limited |
13 Hickson Road WALSH BAY - SYDNEY |
Plan of Subdivision of Lot 23 in DP 1071597 |
| 689 |
20-Aug-2008 |
21-Jul-2008 |
Approved |
Malibru Pty Ltd |
9 Dorset Road NORTHBRIDGE |
Installation of Jib Crane at Boatshed to Lift Inflatable Boat |
| 701 |
18-Aug-2008 |
15-Aug-2008 |
Approved |
Brookfield Multiplex |
1 Shelley Street - KSW - SYDNEY |
Stratum Subdivision Plan |
| 678 |
15-Aug-2008 |
17-Jun-2008 |
Approved |
Maurici |
66 The Point Road WOOLWICH |
Installation of Slipway and Replacement of Part of Existing Fixed Jetty with Ramp and Pontoon |
| 676 |
08-Aug-2008 |
17-Jun-2008 |
Approved |
Lockett |
53 Minimbah Road NORTHBRIDGE |
S96 Application to Modify Approved Waterfront Structures |
| 691 |
08-Aug-2008 |
24-Jul-2008 |
Approved |
Brookfiled Multiplex Services Pty Ltd |
Lime Street KSW - SYDNEY |
Installation of Guardrails at 25 - 55 Lime Steet Sydney |
| 694 |
08-Aug-2008 |
24-Jul-2008 |
Approved |
Weatherdon |
27 Elemang Avenue KIRRIBILLi |
S96 - Modification to Development Consent DA 688/07 to Staged Construction Approval |
| 692 |
08-Aug-2008 |
30-Jul-2008 |
Approved |
Blue Line Cruises Pty Ltd |
The Promenade, Wharves 1,2,4 &5 King Street Wharf SYDNEY |
Promenade Wharf Marker Signage |
| 699 |
08-Aug-2008 |
06-Aug-2008 |
Approved |
Maurice |
Lot 50, The Promenade KSW - SYDNEY |
Temporary Installation of a Prop (Pipe) for Publicity Purposes |
| 668 |
05-Aug-2008 |
16-May-2008 |
Approved |
Spicey Caricorn P/L |
1 Ithaca Road ELIZABETH Bay |
Upgrade and Expand Elizabeth Bay Marina |
| 690 |
31-Jul-2008 |
30-Jul-2008 |
Approved |
Sdney Seaplanes Pty Ltd |
Lyne Park ROSE BAY |
Upgrade of Seaplane Base and Facilities |
| 671 |
30-Jul-2008 |
28-May-2008 |
Approved |
Spencer |
7 Toocooya Road HUNTERS HILL |
Replace Existing Poly Sleeved Timber Piles x 3 with Sleeved Capped Steel Piles |
| 650 |
24-Jul-2008 |
28-Mar-2008 |
Approved |
Mastronardo |
8A Pile Street GLADESVILLE |
Alterations to Existing Berthing Arrangement to Accommodate the Permanent Mooring of a 17m Motor Yacht |
| 684 |
24-Jul-2008 |
27-Jun-2008 |
Approved |
Woollahra Council |
18 Marine Parade WATSONS BAY |
Seawall Repairs and Landscaping |
| 685 |
24-Jul-2008 |
08-Jul-2008 |
Approved |
Billbergia Developments Pty Ltd |
44 - 46 Walker Street RHODES |
Construction Medium Density Residential Flat Building - Stage 2A |
| 686 |
24-Jul-2008 |
14-Jul-2008 |
Approved |
TMG Developments Pty Ltd |
East Esplanade MANLY |
Extension of Western Pergola at the Southern Most End - New Timber Framed pergola Over Existing Outdoor Seating Area - Shop 2,3,4 & 5 |
| 673 |
21-Jul-2008 |
22-May-2008 |
Approved |
St George and Sutherland Shire Anglers Club Inc |
2-28 Alexander Ave TAREN POINT |
Dredging to Entrance Channel |
| 665 |
16-Jul-2008 |
09-May-2008 |
Approved |
Smith |
67 Fitzwilliam Road VAUCLUSE |
Part demolition of Existing Concrete Skid New Slipway and Landing Steps |
| 677 |
16-Jul-2008 |
17-Jun-2008 |
Approved |
Brookfield Multiplex Services |
Lime Street KSW - SYDNEY |
Termporary Installation of Screen |
| 592 |
03-Jul-2008 |
21-Nov-2007 |
Approved |
Breakfast Point Pty Ltd |
19-21 Tennyson Road Breakfast Point |
Marina for Commercial Purposes Containing up to 172 Berths and Ferry Berth |
| 679 |
03-Jul-2008 |
23-Jun-2008 |
Approved |
Insight Projects P/L |
13 hickson Road WALSH BAY |
Interior Office Fitout - Suites 4 & 8 (Level 2) - Heritage Exemption |
| 680 |
03-Jul-2008 |
23-Jun-2008 |
Approved |
TMG Developments Pty Ltd |
East Esplanade MANLY |
External Alterations and Signage |
| 681 |
03-Jul-2008 |
26-Jun-2008 |
Approved |
Cheng Lam |
16A Hickson Road SYDNEY |
Change of Usage from Office to Sports Massage Business |